EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

PJM Reports Resources Are Adequate to Meet Growing Summer Demand

LCG, May 7, 2026--PJM issued today its Summer Outlook 2026, which forecasts sufficient generation for typical peak demand this summer. PJM states that it is prepared to call on contracted demand response resources to reduce electricity use during times of high system stress.

Read more

NRC Approves Oklo's Principal Design Criteria Topical Report for Aurora Powerhouse

LCG, May 6, 2026--Oklo Inc. ("Oklo"), an advanced nuclear technology company, announced today that the U.S. Nuclear Regulatory Commission (NRC) has approved the Principal Design Criteria (PDC) topical report for the Aurora-INL (Idaho National Laboratory) nuclear small modular reactor (SMR), which is currently under construction in Idaho. The PDC topical report establishes a regulatory framework that defines the fundamental safety, reliability, and performance requirements to guide future reactor licensing and design activities, and the approved report should simplify future applications and reduce the need to re-review established material.

Read more

Industry News

Energy Strike in France Reduces Output and Exports

LCG, June 3, 2003-French workers went on a 24-hour strike Tuesday, reducing electricity output by 6.4 percent.

According to the CGT union, output was decreased by as much as 7,300 megawatts. Exports of electricity were reduced by more than 5,000 megawatts.

The strike had an effect on 6 of 19 French nuclear plants, as weland hampered operations at fossil fuel-powered plants. France gets 80 percent of its total power from nuclear-based generation.

Other union officials said the output would have been more dramatically reduced had several nuclear stations not increased production to prevent blackouts.

Workers are striking because of pending pension reforms and the privatization of Electricite de France and Gaz de France.

Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service