EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

Oklo and Siemens Energy Sign Agreement to Accelerate Power Conversion System for New SMR in Idaho

LCG, November 19, 2025--Oklo Inc. and Siemens Energy announced today that the parties have signed a binding contract for the design and delivery of the power conversion system for Oklo’s Aurora-INL (Idaho National Laboratory) nuclear small modular reactor (SMR). The agreement authorizes Siemens Energy to begin engineering and design work to expedite procurement of long-lead components and to initiate the manufacturing process for the power conversion system. Oklo’s expertise in advanced fission technology will be combined with Siemens Energy’s extensive industry experience with steam turbine and generator systems, with the ultimate goal of generating carbon-free, reliable electricity.

Read more

NERC's New Winter Reliability Assessment Raises Concerns for Elevated Risk of Insufficient Supplies to Meet Demand in Extreme Operating Conditions

LCG, November 19, 2025--NERC yesterday released its 2025–2026 Winter Reliability Assessment (WRA), which concludes "much of North America is again at an elevated risk of having insufficient energy supplies to meet demand in extreme operating conditions." The WRA does state that resources are adequate for normal winter peak demand, but extended, wide-area cold snaps will be challenging.

Read more

Industry News

Palomar Energy Project Breaks Ground

LCG, July 23, 2004--With California's electricity demand setting new peak records, groundbreaking ceremonies were held for the Palomar Energy Project, a 550-megawatt power plant in Escondido, California. The plant is being built by Palomar Energy LLC, a subsidiary of Sempra Energy Resources. SDG&E, a regulated utility and subsidiary of Sempra Energy, will purchase and operate the plant upon completion, which is scheduled for mid-2006.

The natural gas-fired, combined cycle plant includes two combustion turbine-generators equipped with dry low combustors and evaporative inlet air coolers, two heat recovery steam generators equipped with duct burners, a steam turbine-generator and associated auxiliary systems and equipment. The project includes a new 230 kV switchyard connecting with an existing SDG&E electric transmission line located immediately adjacent to the project site.

Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service