EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

Invenergy Announces New Agreements with Meta for Renewable Energy to Support Data Center Operations

LCG, June 26, 2025--Invenergy today announced that they and Meta Platforms, Inc. have signed four new clean energy agreements that total an additional 791 MW of procured solar and wind capacity to support Meta's near-term operations, data center growth, and clean energy goals.

Read more

New York Power Authority to Develop New Nuclear Facility in Upstate New York

LCG, June 23, 2025--The Governor of New York today directed the New York Power Authority (NYPA) to develop and construct an advanced nuclear power plant in upstate New York to deliver zero-emission power that supports a reliable and affordable electric grid. NYPA will lead the effort to develop at least one new nuclear energy facility with a combined capacity of at least one gigawatt (GW) of electricity, either alone or in partnership with private entities. The directive builds on the Governor’s 2025 State of the State to develop nuclear energy plans in New York.

Read more

Industry News

Growing Competition for New Nuclear Reactor Designs

LCG, September 16, 2005--Constellation Energy and AREVA Inc. announced yesterday that they formed a joint venture, UniStar Nuclear, to develop and sell new nuclear power plants in the United States. The plants will be based upon AREVA's 1,600-MW European pressurized water reactor (EPR) that is currently being deployed in Europe. Bechtel Power Corporation will support the venture with its expertise as an architect-engineer and constructor.

Unistar Nuclear will provide the platform to develop joint ventures, and AREVA will be the prime contractor, providing the nuclear reactor and all support systems, instrumentation and control system and initial load of nuclear fuel. Constellation Energy, through new joint ventures, would license, construct, own and operate the new nuclear power plants based upon AREVA's EPR design.

The EPR design is used in one reactor currently under construction in Finland and is used in another reactor to be built in France. The companies stated that over 200 engineers are now working in support of obtaining a design certification for the U.S. Evolutionary Power Reactor (US EPR) as a standard plant from the United States Nuclear Regulatory Commission (NRC). The companies expect that new plants will be ready to begin production in 2015.

The announcement of the new venture adds to the growing competition associated with the development of new nuclear reactors. On August 31, GE Energy submitted its Design Certification application to the NRC for its economic simplified boiling water reactor (ESBWR). GE anticipates the Final Design Approval toward the end of 2006 and that it will receive Design Certification immediately thereafter. The ESBWR is a 1,500-MW design that incorporates passive safety features that rely upon natural forces, such as gravity, in order to reduce reliance on active, mechanical systems, like pumps and valves.

Another primary reactor design for consideration in the United States is offered by Westinghouse Electric. A year ago, the NRC granted a Final Design Approval to Westinghouse for its AP1000 advanced reactor design.

Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service