|
News
|
LCG, November 12, 2025--LCG Consulting is excited to announce the release of the MISO 2034 Data Model, built from the latest MISO Transmission Expansion Plan (MTEP). This powerful, nodal-level data model offers a forward-looking view of generation, transmission, and load forecasts across the MISO region—empowering energy professionals to explore the grid of the future with confidence.
Read more
|
|
LCG, November 12, 2025--Xcel Energy, together with the Utility Consumer Advocate (UCA), Colorado Energy Office (CEO), and Trial Staff of the Public Utilities Commission (PUC), filed a petition on November 10 requesting Commission approval to keep Comanche Generating Station Unit 2 available for up to one additional year after its currently planned retirement on December 31, 2025.
Read more
|
|
|
Industry News
Construction Begins on Silver Star Wind Project in Texas
LCG, September 13, 2007--Construction commenced yesterday on the Silver Star Project in west central Texas. The 60-MW wind farm will include twenty-four, 2.5 MW Liberty Wind Turbines are manufactured by Clipper Windpower in Cedar Rapids, Iowa. Clipper will own 15% of the project, and BP Alternative Energy will own 85%. The project is scheduled to begin commercial operations in early 2008. The Silver Star Project is being built in Eastland and Erath Counties and will dispersed over a 54,000 acre site. According to the developers, the footprint of the project facilities will use less than one the percent of the total area, which will continue to be used for ranching.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|