EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

LCG Publishes 2024 Annual Outlook for Texas Electricity Market (ERCOT)

LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.

Read more

LCG Publishes 2024 Annual Outlook for Texas Electricity Market (ERCOT)

LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.

Read more

Industry News

Construction Begins on Silver Star Wind Project in Texas

LCG, September 13, 2007--Construction commenced yesterday on the Silver Star Project in west central Texas. The 60-MW wind farm will include twenty-four, 2.5 MW Liberty Wind Turbines are manufactured by Clipper Windpower in Cedar Rapids, Iowa. Clipper will own 15% of the project, and BP Alternative Energy will own 85%. The project is scheduled to begin commercial operations in early 2008.

The Silver Star Project is being built in Eastland and Erath Counties and will dispersed over a 54,000 acre site. According to the developers, the footprint of the project facilities will use less than one the percent of the total area, which will continue to be used for ranching.
















Copyright © 2024 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service