EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

EIA Analysis of Southwest Hydropower Generation Shows Record Lows and Slow Recovery

LCG, November 13, 2026--The U.S. Energy Information Administration (EIA) today issued an "In-Brief Analysis" highlighting the record lows for hydropower generation in the Southwest this summer. The prolonged drought conditions affecting the Colorado River Basin caused record low hydropower generation this summer in the Southwestern electricity supply region, which includes Arizona, New Mexico, and small parts of Nevada and California. Hydropower generation from April through August 2026 was a full 28 percent lower than the 10-year average and 19 percent lower than during the same period last year.

Read more

NRC Issues Construction Permit for Long Mott High-Temperature, Gas-Cooled Reactor in Texas

LCG, November 11, 2026--The Nuclear Regulatory Commission (NRC) announced on November 9 that it has approved the Construction Permit Application ("CPA") for the Long Mott Generating Station in Texas. Long Mott Energy, LLC (LME) must obtain a separate operating license from the NRC before loading fuel or operating the reactors.

Read more

Industry News

ACCIONA Windpower Introduces 3 MW Wind Turbine

LCG, June 5, 2008--ACCIONA Windpower this week introduced its 3-MW wind turbine at the American Wind Energy Association's (AWEA) Windpower 2008 Conference and Exhibition in Houston, Texas. ACCIONA states that deliveries of the AW-3000 wind turbine are expected in the second half of 2010.

ACCIONA developed the AW-3000 based on extensive experience with the existing AW-1500. The new, 3.0-MW wind turbine is designed to operate in three wind classes: IEC Ia, IEC IIa and IEC IIIa. The AW-3000 is designed to operate at variable speed with an independent pitch system for each blade.

The dimensions of the AW-3000 are impressive. Three rotor diameter options are available: 100, 109 and 116 meters. The turbine is supplied with a concrete tower that provides a hub height of either 100 or 120 meters - both of which are taller than the Statue of Liberty - including her base.

ACCIONA Windpower manufactures wind turbines at four factories, with two located in Spain and one each in the United States, and China. The plant located in West Branch, Iowa will produce both the AW-3000 and the AW-1500 wind turbines.
Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service