EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

LCG Publishes 2024 Annual Outlook for Texas Electricity Market (ERCOT)

LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.

Read more

LCG Publishes 2024 Annual Outlook for Texas Electricity Market (ERCOT)

LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.

Read more

Industry News

Waste-to-Power Project Gains Momentum in Maryland

LCG, February 5, 2009--The Northeast Maryland Waste Disposal Authority (NMWDA), together with the Frederick County Division of Utilities and Solid Waste Management and Carroll Country Department of Public Works, Tuesday announced the selection of Wheelabrator Technologies, Inc. as the preferred vendor to construct and operate a new waste-to-power facility to serve the solid waste disposal and energy needs of Frederick and Carroll Counties.

The greenfield facility will be designed to receive up to 1,500 tons per day of municipal solid wastes and to produce up to 55 MW of electricity. The facility will be located in Frederick County, Maryland.

The project is scheduled for completion in 2014. Project approval from both counties' Board of Commissioners will be sought shortly, with permitting, engineering and construction to follow.

Wheelabrator Technologies, Inc. is a wholly owned subsidiary of Waste Management, Inc.



Copyright © 2024 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service