News
LCG, March 31, 2021--The Governor of Massachusetts signed legislation last Friday that authorizes the state to direct utilities to purchase an additional 2,400 MW of offshore wind energy by 2027.
Read more
|
LCG, March 25, 2021--The Public Utilities Commission of Nevada (PUCN) on Monday approved proceeding with NV Energy's Greenlink Nevada transmission and renewable energy initiative. NV Energy's planned investment in Greenlink is over $2.5 billion.
Read more
|
|
|
Industry News
Geothermal Project Nears Full Operations
LCG, March 13, 2009--Raser Technologies Inc. plans to start delivering 7 MW of electricity next week from its new geothermal facility in Utah to the City of Anaheim, California. The plant output is expected to increase shortly up to 10 or 11 MW.
The power plant facility constructed in southwestern Utah. The system is designed for relatively small temperature differentials, which increases the potential locations that can be developed across the country.
Water is heated by geothermal energy underground, and the energy is transferred to a refrigerant, with the water reinjected underground. The facility uses an organic Rankine cycle-based power system with refrigerant, rather than steam, to generate power in a closed system that has essentially no emissions.
The facility uses 50 modular units provided by UTC Power, a division of United Technologies Corp. The facility was constructed in just over a year.
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
PowerMax
Day-ahead and real-time portfolio revenue optimization
|
|
Generator X
Generation and Transmission Planning and Optimization
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
MarketWatch
Annual summary of prices, congestion and important events in ERCOT
|
|
|