EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

Siemens Energy to Provide Hydrogen-Capable Gas Turbines to OPPD

LCG, June 18, 2021--Siemens Energy announced yesterday that Siemens Energy will provide two F-Class turbines to power Omaha Public Power District's (OPPD) new Turtle Creek Station Peaking Plant in Papillion, Nebraska.

Read more

Summer 2021 Resource Adequacy Scenarios- Revised Report

LCG June 11, 2021--LCG Consulting (LCG) has released its analysis of resource adequacy in ERCOT for summer 2021, as we do each spring.

Read more

Industry News

Georgia EPD Issues Draft Permits for Proposed Coal-fired Power Plant in Georgia

LCG, August 26, 2009--POWER4Georgians, a coalition of Georgia electric membership cooperatives (EMCs), announced yesterday that the Georgia Environmental Protection Division (EPD) issued draft permits for their proposed coal-fired, power plant in Georgia. The Georgia EPD issued drafts of the air permit, the surface water withdrawal permit, the groundwater withdrawal permit, and the water discharge permit.

The proposed power station, Plant Washington, would be an 850-MW, electric generating station located on a 1,600-acre site in Washington County, Georgia. The project incorporates supercritical technology to improve efficiency and better enable reduced emissions.
Copyright © 2021 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
PowerMax
Day-ahead and real-time portfolio revenue optimization
Generator X
Generation and Transmission Planning and Optimization
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
MarketVision
Daily LMP Forecast for ERCOT
MarketWatch
Annual summary of prices, congestion and important events in ERCOT
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service