EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

Wärtsilä to Supply the Engineering and Equipment to East Kentucky Power Cooperative for 217-MW Power Plant

LCG, August 27, 2025--Wärtsilä Energy announced yesterday an agreement with East Kentucky Power Cooperative (EKPC) to supply the engineering and equipment for a 217-MW power plant to be constructed in Liberty, Kentucky. The Wärtsilä equipment is scheduled for delivery in mid-2027, and the plant is expected to be commissioned in early 2028.

Read more

TerraPower, Utah's Office of Energy Development, and Flagship Companies Sign MOU to Identify Sites for Advanced Nuclear Reactors

LCG, August 25, 2025--The Utah Office of Energy Development (OED), TerraPower and Flagship Companies announced today the signing of a Memorandum of Understanding (MOU) to explore the potential siting of a Natrium® nuclear reactor and energy storage plant in Utah. The MOU establishes a shared commitment to support advanced nuclear technologies to build Utah’s energy future and to prioritize reliability, economic growth and energy abundance.

Read more

Industry News

NRC Announces Hearing Opportunity for License Renewal of Exelon's Byron and Braidwood Nuclear Stations

LCG, July 25, 2013--The Nuclear Regulatory Commission (NRC) announced yesterday the opportunity to request an adjudicatory hearing on Exelon Generation Company's application to renew the operating licenses of the Byron and Braidwood nuclear power plants, which are located in Illinois. If the licenses are extended, nearly 2,700 MW of non-carbon emitting generating capacity will survive for another 20 years.

Exelon filed the application on May 29, and the NRC staff has determined the application is sufficiently complete to allow the staff to formally docket the application and commence its technical and environmental reviews.

Exelon filed the application to renew and extend the operating licenses for an additional 20 years of operation. The current operating licenses for Braidwood expire on October 17, 2026, for Unit 1 and December 18, 2027, for Unit 2; the licenses for Byron expire October 31, 2024, for Unit 1 and November 6, 2026, for Unit 2.

The Braidwood Nuclear Station, with a capacity of 2,360 MW, is Exelon's newest nuclear power plant and is located about 60 miles southwest of Chicago. The Byron Nuclear Station is located about 110 miles west of Chicago and has a net generating capacity of 2,336 MW.

Both stations include two pressurized-water reactors.

Exelon submitted a single application to cover both plants due to the similarities in the systems, structures and components of each that are analyzed in a license renewal review.

The NRC stated that requests for a hearing on the application must be filed by September 23.
Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service