EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

EIA Estimates Record U.S. Electric Generating Capacity Additions in 2026, with Solar in the Lead

LCG, February 20, 2026--The EIA today issued an "in-brief analysis" that estimates U.S. power plant developers and operators plan to complete a record installation of 86 GW of new, utility-scale electric generating capacity that is connected to the U.S. power grid in 2026. Last year, 53 GW of new capacity was added to the grid, which was the largest capacity installation in a single year since 2002. Thus the estimate of 86 GW of new capacity in 2026 is a whopping 33 GW greater than the year prior. It should be noted that over 20 GW of the 86 GW of new capacity this year is estimated to be completed in December.

Read more

Enhanced Geothermal Systems May Drive Significant Growth in Geothermal Power Generation

LCG, February 19, 2026--The EIA released an "in-brief analysis" today regarding the expected completion of the first, large-scale commercial enhanced geothermal system (EGS) in June 2026, and the significant growth potential for year-round, 24x7, carbon-free, renewable EGS power generation in the United States.

Read more

Industry News

CPV, GE and ArcLight Announce Financial Closing for Woodbridge Energy Center

LCG, September 23, 2013--Competitive Power Ventures (CPV), GE Energy Financial Services and ArcLight Capital Partners (ArcLight) announced Friday that they have closed financing for the $842 million CPV Woodbridge Energy Center in New Jersey. Project construction on the 700-MW, natural gas-fired, combined cycle facility is scheduled to commence this quarter, with commercial operation as early as the first quarter of 2016.

The project is owned by CPV, ArcLight and Toyota Tsusho and will be operated by an affiliate of ArcLight. GE is providing financing, technology and services, including a 16-year contractual services agreement (CSA). According to the announcement, the project capacity is expected to be sold through 15-year Standard Offer Capacity Agreements (SOCA) with New Jersey utilities, and energy through a hedge.

GE will deliver its FlexEfficiency* 60 combined-cycle technology and engineering services for the project. The package includes two, fast-start 216-MW 7F 5-series gas turbine generators, one D-11A steam turbine generator in a "2x1" configuration and two duct-fired, triple-pressure reheat heat recovery steam generators (HRSGs).

The CPV Woodbridge Energy Center will convert a former chemical plant site into a power generation facility.

CPV's president stated, "Land reclamation, environmental benefits, strong community acceptance, a powerful economic impact and labor support: This project is what smart energy development looks like in 2013."
Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service