EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

NextEra Energy Resources and Basin Electric Power Cooperative Announce MOU to Develop 1,450-MW Natural Gas-fired Power Plant in North Dakota

LCG, December 8, 2025--Basin Electric Power Cooperative (Basin Electric) and NextEra Energy Resources, LLC (NextEra) today announced that they have signed a memorandum of understanding (MOU) to explore the joint development of the River Run Energy Center, a new combined-cycle natural gas-fueled generation facility in Basin Electric's North Dakota service territory. The proposed facility will have a planned capacity of approximately 1,450 MW.

Read more

LCG Releases January–March 2026 PJM Congestion Outlook Featuring Fundamentals-Based 3-Month Forecast

LCG, December 2, 2025 — LCG today announced the release of its PJM Congestion Outlook for January–March 2026, delivering a fundamentals-based, three-month forecast designed to help traders and risk managers better navigate congestion risks in PJM’s FTR markets.

Read more

Industry News

DONG Energy Announces Opening of the Burbo Bank Extension Project with 8-MW Offshore Wind Turbines

LCG, May 23, 2017--The Burbo Bank Extension Project, a new offshore wind farm in Liverpool Bay, UK, opened on May 17 and became the first offshore wind farm to make commercial use of the MHI Vestas V164-8.0 MW wind turbines. The wind farm is a joint venture between DONG Energy (50%) and its partners PKA (25%) and KIRKBI A/S, parent company of the LEGO Group (25%).

The 8-MW wind turbines are massive, measuring 195 meters from sea level to blade tip. Each blade weighs 35 metric tonnes and measures 80 meters long. The maximum output for the Burbo Bank Extension Project is 258 MW.

DONG Energy's Chief Executive Officer (CEO) stated, "Burbo Bank Extension showcases the rapid innovation in the offshore wind industry. Less than ten years ago at Burbo Bank, we were the first to install Siemens 3.6-MW wind turbines and in this short time, the wind turbines have more than doubled in capacity. Pushing innovation in this way reduces the cost of electricity from offshore wind and will help to advance the offshore wind industry across the world."

The CEO of MHI Vestas stated, "The inauguration of Burbo Bank Extension represents a noteworthy milestone in the history of MHI Vestas and our stakeholders. We are extremely proud to supply 32 of our 8 MW turbines to DONG Energy and help provide renewable energy for more than 230,000 UK homes."
Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service