EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

Duke Energy Renewables Announces Commercial Operations Achieved for 150-MW Solar Project

LCG, June 20, 2019--Duke Energy Renewables, a subsidiary of Duke Energy, yesterday announced that its 150-MW North Rosamond solar project in Kern County, California, has commenced commercial operation. The power produced from the project is being sold to Southern California Edison (SCE) under a 15-year agreement.

Read more

ERCOT 2019 Summer Quarter Outlook

LCG, May 29, 2019-- LCG released a new summer (June – September 2019) report that looks at how the ERCOT grid copes with strained network conditions. Resource adequacy analysis for the region is especially important during extreme summer loading conditions. This summer the network is under particular scrutiny as the reserves have tightened because of recent retirements.

Read more

Industry News

DONG Energy Announces Opening of the Burbo Bank Extension Project with 8-MW Offshore Wind Turbines

LCG, May 23, 2017--The Burbo Bank Extension Project, a new offshore wind farm in Liverpool Bay, UK, opened on May 17 and became the first offshore wind farm to make commercial use of the MHI Vestas V164-8.0 MW wind turbines. The wind farm is a joint venture between DONG Energy (50%) and its partners PKA (25%) and KIRKBI A/S, parent company of the LEGO Group (25%).

The 8-MW wind turbines are massive, measuring 195 meters from sea level to blade tip. Each blade weighs 35 metric tonnes and measures 80 meters long. The maximum output for the Burbo Bank Extension Project is 258 MW.

DONG Energy's Chief Executive Officer (CEO) stated, "Burbo Bank Extension showcases the rapid innovation in the offshore wind industry. Less than ten years ago at Burbo Bank, we were the first to install Siemens 3.6-MW wind turbines and in this short time, the wind turbines have more than doubled in capacity. Pushing innovation in this way reduces the cost of electricity from offshore wind and will help to advance the offshore wind industry across the world."

The CEO of MHI Vestas stated, "The inauguration of Burbo Bank Extension represents a noteworthy milestone in the history of MHI Vestas and our stakeholders. We are extremely proud to supply 32 of our 8 MW turbines to DONG Energy and help provide renewable energy for more than 230,000 UK homes."
Copyright © 2019 LCG Consulting. All rights reserved. Terms and Copyright
Generator X
Generation and Transmission Planning and Optimization
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
PowerMax
Day-ahead and real-time portfolio revenue optimization
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
MarketWatch
Annual summary of prices, congestion and important events in ERCOT
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service