EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

Wärtsilä to Supply the Engineering and Equipment to East Kentucky Power Cooperative for 217-MW Power Plant

LCG, August 27, 2025--Wärtsilä Energy announced yesterday an agreement with East Kentucky Power Cooperative (EKPC) to supply the engineering and equipment for a 217-MW power plant to be constructed in Liberty, Kentucky. The Wärtsilä equipment is scheduled for delivery in mid-2027, and the plant is expected to be commissioned in early 2028.

Read more

TerraPower, Utah's Office of Energy Development, and Flagship Companies Sign MOU to Identify Sites for Advanced Nuclear Reactors

LCG, August 25, 2025--The Utah Office of Energy Development (OED), TerraPower and Flagship Companies announced today the signing of a Memorandum of Understanding (MOU) to explore the potential siting of a Natrium® nuclear reactor and energy storage plant in Utah. The MOU establishes a shared commitment to support advanced nuclear technologies to build Utah’s energy future and to prioritize reliability, economic growth and energy abundance.

Read more

Industry News

Innergex and BlackRock Announce Commercial Operation of the 200 MW Flat Top Wind Farm in Texas

LCG, March 28, 2018--Innergex Renewable Energy Inc. and BlackRock Real Assets announced the commissioning on March 23, 2018, of the 200-MW, Flat Top wind farm located in central Texas.

The Flat Top wind farm includes 100 Vestas V110 wind turbines that each have a nameplate capacity of 2.0 MW. Vestas will operate the wind farm under a 10-year operation and maintenance contract.The wind farm is located in Comanche and Mills Counties.

Innergex holds a 51 percent interest in the wind farm, which was acquired on February 6, 2018, as part of the acquisition of Alterra Power Corp. A fund managed by BlackRock Real Assets holds the remaining 49 percent. Alterra Power Corp. acquired the project in June 2016.

The President and Chief Executive Officer of Innergex stated,
"Innergex is proud to continue its core mission with the commissioning of another reliable, affordable, clean and renewable energy facility that will play a part in addressing global climate change. The commissioning of our second wind farm in Texas is a significant milestone in our strategy as we aim to increase our presence in the United States where we intend to bring more high-quality projects online in a near future."

"We are very pleased to invest in the Flat Top wind farm on behalf of our clients. This transaction demonstrates BlackRock's continued focus on renewable power investments, which currently amount to US$5 billion of equity assets under management," said the head of BlackRock Renewable Power Americas and APAC. "We continue to see the U.S. an attractive market for wind assets where BlackRock have invested in more than 30 wind and solar projects."
Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service