News
LCG, August 27, 2025--Wärtsilä Energy announced yesterday an agreement with East Kentucky Power Cooperative (EKPC) to supply the engineering and equipment for a 217-MW power plant to be constructed in Liberty, Kentucky. The Wärtsilä equipment is scheduled for delivery in mid-2027, and the plant is expected to be commissioned in early 2028.
Read more
|
LCG, August 25, 2025--The Utah Office of Energy Development (OED), TerraPower and Flagship Companies announced today the signing of a Memorandum of Understanding (MOU) to explore the potential siting of a Natrium® nuclear reactor and energy storage plant in Utah. The MOU establishes a shared commitment to support advanced nuclear technologies to build Utah’s energy future and to prioritize reliability, economic growth and energy abundance.
Read more
|
|
|
Press Release
ERCOT 2018 Summer Quarter Outlook
LCG, July 16, 2018-- LCG released a new third quarter (July – August 2018) report that looks at how the ERCOT grid can cope with strained network conditions. Resource adequacy analysis for the region is especially important during extreme summer loading conditions. This summer the network is under particular scrutiny as the reserves have tightened because of recent retirements.
This report examines a Base Case, a High Generation Outage Case, a Low Wind Case and a High Load Case. It discusses which strained conditions might shift in the outlook for energy prices, Operating Reserve Demand Curve (ORDC), Peaker Net Margin (PNM), and congestion.
LCG performed this study using hourly dispatch and its proprietary UPLAN Network Power Model. LCG has been modeling energy systems for more than 30 years and continuously sustains the most up-to-date information on every detail of the Texas grid, from minor and major transmission upgrades to gas prices and weather patterns.
If you are interested in receiving the full summer quarter outlook, please contact us at julie.chien@energyonline.com. For more in depth analysis, LCG can provide tailored datasets, such as individualized generator performance, hourly prices, and much more.
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|